Liaohe Oilfield Shuguang oil well development process is mainly to pump-based lifting. The drawbacks of the lifting process are that the pumping unit has high energy consumption, low system efficiency, serious eccentric tube and rod grinding, high production cost of the well, and short inspection cycle. These problems severely restrict the normal production of low-yielding wells. In order to break through these production difficulties, technicians constantly explore cutting-edge technologies and actively introduce numerical controlled reciprocating submersible pump production technology that can effectively prevent eccentric wear of the pipe rods according to the reservoir properties and oil characteristics of Shuguang Oilfield. The successful test of the technology marks a major breakthrough in solving the partial wear of the oil well pipe rod and reducing the energy consumption of wells with low productivity. It also marks a strong technical support for the large-scale production of similar oil wells. This product belongs to the second era crylic acid structural glue developed by the freshest technology from German. It has rapid solidification at normal temperature, multi-purpose, powerful strength, long shelf life, powerful peel strength, aging-resistance, climatization- resistance and easy for mixing operation and application. It can availably adhesive the surface with a little water or oil. The general function is better than common structural glue. Auto Parts Glue,Acrylic Adhesive,Tire Patch Glue,Acrylic Adhesive Glue Hunan Magpow Adhesive Group co.,ltd , https://www.magicglue.net
Scope of application:
Quick adhesive and seal for metal, plastic (PVC, ABS, PS, PC), pottery, wood, polystyrene, glasses and cements etc. or quick bond and repair of motors, motorcar, tractor, electric engines, instruments ,washing machine, crafts, weaving machine, metallurgy and smelting machine and refrigerator etc.
Using Method:
Remove the oil, dust from the surface and keep clear, dry.
2. Paste evenly at 1:1 from two tubes, paste separately on each side and press for solidification. Normally solidify after 5-8 at normal temperature, reach the highest at 24 hours
Warning:
1. The taking glue tool could not mix use, should be tightly sealed,
do not mix Cap A and B.
2. The glue quantity should not exceed, use at the scene. The operation place should be ventilate and far from fire.
3. Avoid the skin contact, if touches the skin, clean with soap water, if touches the eye carelessly, uses the massive clear water flushing immediately, go to hospital for serious situation.
4. Do not get into mouth, keep out reach of kids.
5. Make a trial usage in advance to avoid mistake.
Liaohe Oilfield Shuguang Oil Recovery Plant introduced earlier this year, the reciprocating submersible pump oil production technology, through the pre-applicability study, June 2 at Shu 2-3-3 well into the field test and was successful.