Model NO.: RF-WA
Hydraulic Station Power: 4 Kw
Shaft Material: 45# Steel,70mm
Delivery Time: 45 Days After Deposit
Warranty: 12 Months
Trademark: Suhang
Transport Package: Film and Steel
Specification: CE, SGS, ISO9001: 2008
Origin: Wuxi, Jiangsu
HS Code: 8455229090
Cold Bending Roof Wall Angle Roll Forming Machine
 
  Items Specifications Remarks
Material of coil Material Thickness 0.4-0.8 mm galvanized sheet G550  
Forming system Rolling Speed About 20 m/min line speed  
Roller Stations About 9 stations  
Roller Material 45# Steel with quenching 60mm shaft
 
 
Maim Motor Power 5.5 kw  
hydraulic station Power 4 kw  
Cutting
system
Material Of Cutting CR12 with quench treatment  
Hardness HRC58-62  
Tolerance +-1.5mm  
Electrical control system Electric Source 380V, 50HZ,3 phase
Also can satisfy Customer's require
 
Control System PLC control system  
  Weight About 2.5 tons  
  Way Of Drive 1 inch single chain  
  Size of machine Length 4500mm* Width 500mm* Height 800m  


Transportion

All goods will be shipped to your country, containers number will be decided with how many machines you would choose

Installation of the machine

    The individual components of the machine are installed according to the layout and prepared for the commissioning.
The installation comprises of:
   -   Installation by Suhang service technicians.
    -   The following services are included:
    -   Installation of the machine components.
    -   Adjustment of the machine components.
    -   Connection of all motors to the control cabinet.
    -   Installation of the required safety devices.
    Delivery extent does not comprise of:
    -  Media supply (electrics, compressed air, etc.)to the machine(control cabinet)
    -  Raw material,process material and fuels
    -  Raw material for test blocks
    -  Transport and lifting devices
-  Auxiliary staff.
    The operators of the plant should be present during the installation in order to become familiar with the new machines.

Commissioning of the machine

    The components of the machine are commissioned one after the other. At the end of the commissioning the machine is ready for production and is handed over.
    The commissioning comprises:
    -  Commissioning by Suhang service technicians
    -  Training at the machine
    -  The following services are rendered
    -  Run up of the machine components
    -  Testing of all functions of the machine components
    -  Start of a fully automatic molding process
    -  Execution of machine acceptance
    Delivery extent does not comprise of:
    -  Raw materials, process materials and consumables
    -  Raw material for test blocks
    -  Transport and lifting devices
    The operators of the plant should be present during the commissioning in order to become familiar with the new machines.

Our After-Sales Service Commitments
    Suhang hereby solemnly promises: We implement the "three guarantees" service policy for any equipments sold by Suhang, provide free of charge installation guidelines, commissioning and maintenance of the equipments, training of the Buyer's relevant Operators; and provide technical requirements for the installation and operation of the equipments, technical layout diagrams and other related information, provide a lifetime supply of maintenance and spare parts
The detailed measures are as follows:

1. Guidelines for installation and commissioning of equipments:
Based on the actual situation, to assist and guide the Buyer and Buyer's technical personnel in the overall installation location, the installation of equipments, and provide Buyer with answers to their questions and related issues;
2. Provide training for operation and maintenance personnel:
Based on the Buyer's request, Suhang will provide free of charge training of the operation and maintenance personnel;
a) The User (Buyer) can send their operation and maintenance personnel to our factory for learning and training;
b) When Suhang is doing the installation and test running of the equipments for the Buyer, the Buyer can send their personnel to participate.
3. If failure occurs in any of the machines during the "three guarantees" period(one year), then, upon the Buyer's request, Suhang will eliminate the failure;
4. Suhang will inform all its Buyers about any upgrades and significant product improvements. Suhang will provide equipment modifications based on their costs. Suhang will provide Buyers with high-quality after-sales services in a careful and responsible attitudes, provide very strong guarantee for the Buyer's normal production.
We provide quick and satisfactory customer service, and promise to respond within 24 hours after receiving your complaints by phone or email.

Commercial conditions
 
Payment terms:
40 % deposit, then T/T 60% after the inspection of the equipments by the Buyer or the Buyer's representative at the Seller's factory, but before shipment;

Delivery time:  45 days after received the payment

Warranty Period:
12 months warranty period, starting from the date of the successful installation and commissioning of the equipments at the Buyer's Installation site.

Ford Mustang Grille

Ford Mustang Grille,Mustang Front Grill,Mustang Grille Lights,Mustang Grill Lights

Danyang Weisheng Automotive Technology Co., Ltd , https://www.wizsinparts.com