Ethylene Bis Stearamide,Cas 110-30-5,Ethylene Bis Stearamide Cas 110-30-5,Ethylene Bis Stearamide Ebs Jiangxi Zhilian New Materials Co., Ltd , https://www.zhilian163.com
1. Production Description:
This machine is designed for the cleaning of both internal and external surfaces of steel tubes and pipes. It effectively removes oxide scale, welding slag, and other impurities, revealing a clean metallic surface. The process also helps eliminate internal stress, improving the fatigue resistance of the workpiece. Additionally, it enhances the adhesion of coatings, leading to better surface quality and durability. The blasting process is combined with targeted cleaning methods to ensure complete removal of contaminants.
Use: This series of cleaning machines (QGW) is suitable for various diameter steel tubes and is widely used in petrochemical engineering, steel manufacturing, district heating, water treatment, and more.
2. Advantages:
- Specifically designed for cleaning the outer walls of steel pipes and tubes.
- Features a floor-mounted "BE" air wash separator for easy observation and maintenance.
- The blast chamber and floor are manganese-plated for enhanced durability.
- Fully automatic design ensures high productivity and cost-effective operation.
3. Specifications of Steel Pipe Shot Blasting Machine:
Type
Cleaning Size (mm)
Cleaning Speed (m/min)
Purpose
QGW100
50-300
2-10
Outer wall of shot blasting machine
QGW720
159-720
2-6
QGW1200
219-1016
1-6
QGW1500
325-1600
1-6
QGW2800
1016-2800
1-2
QGN100
50-300
1-4
Inner wall of shot blasting machine
QGN700
325-720
1-2
QGN1000
720-1016
1-4
QGN1500
1016-1500
1-4
4. Structural Characteristics
This machine is a specialized reciprocating steel sand blasting system that includes a blasting chamber, blasting wheel assembly, roller conveyor, abrasive recycling system (screw conveyor, elevator, separator), dust removal system, and electric control system. Each component is designed for optimal performance and durability.
Blasting Chamber
The blasting chamber is constructed using profile steel and steel plates, providing a strong, sealed, and spacious environment for effective blasting operations. It consists of the main body shell, gate, surrounding walls, side walls, roof, and protective panels.
Blast Wheel Assembly
The blast wheel assembly comprises components such as the blast wheel shell, motor, inlet tube, blades, impeller, directional set of balls, points wheel, sand block plate, and protective panels. All wear parts are made from 20% high-chromium cast iron for long-lasting performance.
Screw Conveyor
The screw conveyor consists of a reducer, screw shaft, conveying housing, and rolling bearings. It serves as a standard horizontal abrasive/sand conveying device and is a crucial part of the abrasive recycling system.
Bucket Elevator
The bucket elevator includes a speed reducer, upper and lower drums, transmission rubber belt, bucket elevator, enclosure, and tightening device, ensuring efficient material lifting.
Separator
The machine uses an advanced Model BE full shutter type separator, composed of an air wash area, barrel sieve, conveying screw, abrasive hopper, and manual abrasive control valve.
Dust Removal System
A cartridge or bag-type dust collector is used, ensuring efficient dust removal during operation. The dedusting efficiency reaches up to 99.6%, with powder density below 100mg/m³, exceeding national standards.
Electric Control System
The system features a shot ball circulation failure alarm function. If any part of the system fails, the components automatically stop, preventing damage and ensuring safety.
5. Company Capacity:
1
10 years of professional experience in shot blasting machinery.
2
22,000 m² production workshop with strong manufacturing capabilities.
3
Professional engineers provide tailored solutions for your needs.
4
Strict quality control with CE, BV, and ISO9001 certifications available.
5
Main components use imported international brands for reliability.
6
Timely delivery, just one hour to Qingdao port.
7
Professional after-sales service with 24-hour email response.
8
On-site installation and commissioning at your factory.
6. Trade Information:
MOQ: 1 set.
Payment Currency: USD, RMB, EUR.
Trade Terms: FOB, CIP, CFR, CIF, DDU, DDP.
Payment Terms: 30% deposit via T/T, balance paid before delivery or by L/C at sight.
Delivery Time: 15–40 days depending on the model.
7. After-Sales Service:
1. Installation and commissioning: We send 1–2 technicians to assist with setup; customer covers travel, accommodation, and meals. Customers should arrange 3–4 skilled workers and necessary tools.
2. Warranty: 12 months from completion of commissioning, not exceeding 18 months from delivery.
3. Full English documentation provided, including installation drawings, pit designs, manuals, electrical diagrams, and maintenance guides.
4. Extensive export experience across countries like the USA, Russia, UK, UAE, Mexico, Brazil, and more.
5. High-quality spare parts include high-chrome castings, ZGMn13, etc.
We warmly welcome you to visit our factory in Qingdao.
Steel Pipe Outer Wall Shot Blasting Machine